MRT-3 DERAILMENT NEAR THE PASAY ROTUNDA |
18 Nov. 2017
With the detachment of an MRT-3 car from the
main train link last Thursday, and the subsequent disappearance of the card
which can possibly reveal the cause, the MRT-3 had better be shut down at once
for a TRULY TOP-TO-BOTTOM, 100 PERCENT safety check.
Transportation and MRT officials SHOULD NOT
WAIT A SECOND LONGER, FIRST, for a tragedy to happen which will KILL OR HURT hundreds or thousands of people before finally
suspending operations and DOING EVERYTHING, AS IN EVERYTHING, to ensure the
passenger’s safety 1,001 percent.
Suspending operations, for as long as
necessary, will be a VERY BIG INCONVENIENCE to the hundreds of thousands of MRT
riders daily. NHo question about that.
Pero MAS MABUTI NA ANG MAABALA/MAHIRAPAN sa
halip na PAGLAMAYAN O MASAKTAN. Piso manalo isang libo, walang tatanggi dito pasahero man o opisyal ng gobyerno at
MRT.
While MRT-3 is being repaired, government can
provide buses and other vehicles for passengers at all MRT stations throughout
the train system’s business hours. Besides, it’s ONLY THE MRT-3 which will be
closed temporarily. There’s still the LRT and other MRT lines which can service
MRT-3 passengers up to their destinations or near these. I have a friend form
Quezon City who can ride either the LRT or MRT-3 and still get off at points just
a ride away from her home.
Kung HINDI TITIGIL PANSAMANTALA ang operasyon
ng MRT-3 KILALANIN na ngayon pa lang ng kinauukulan KUNG SINO ANG DAPAT SISIHIN
AT MAKASUHAN/MAKULONG kung sakali, at HUWAG SANANG IPAHINTULOIT NG DIYOS, na
trahedya na ang mangyari sa MRT-3. At
hindi iyung magtuturu-turuan ang kung sinu-sino. 30
No comments:
Post a Comment