Friday, November 17, 2017

SHUT DOWN MRT-3 NOW!

Image result for images of mrt-3  disasters
MRT-3 DERAILMENT NEAR THE PASAY ROTUNDA
18 Nov. 2017

With the detachment of an MRT-3 car from the main train link last Thursday, and the subsequent disappearance of the card which can possibly reveal the cause, the MRT-3 had better be shut down at once for a TRULY TOP-TO-BOTTOM, 100 PERCENT safety check.

Transportation and MRT officials SHOULD NOT WAIT A SECOND LONGER, FIRST, for a tragedy to happen which will KILL OR HURT  hundreds or thousands of people before finally suspending operations and DOING EVERYTHING, AS IN EVERYTHING, to ensure the passenger’s safety 1,001 percent.

Suspending operations, for as long as necessary, will be a VERY BIG INCONVENIENCE to the hundreds of thousands of MRT riders daily. NHo question about that.

Pero MAS MABUTI NA ANG MAABALA/MAHIRAPAN sa halip na PAGLAMAYAN O MASAKTAN. Piso manalo isang libo, walang tatanggi  dito pasahero man o opisyal ng gobyerno at MRT.

While MRT-3 is being repaired, government can provide buses and other vehicles for passengers at all MRT stations throughout the train system’s business hours. Besides, it’s ONLY THE MRT-3 which will be closed temporarily. There’s still the LRT and other MRT lines which can service MRT-3 passengers up to their destinations or near these. I have a friend form Quezon City who can ride either the LRT or MRT-3 and still get off at points just a ride away from her home.


Kung HINDI TITIGIL PANSAMANTALA ang operasyon ng MRT-3 KILALANIN na ngayon pa lang ng kinauukulan KUNG SINO ANG DAPAT SISIHIN AT MAKASUHAN/MAKULONG kung sakali, at HUWAG SANANG IPAHINTULOIT NG DIYOS, na trahedya na ang mangyari  sa MRT-3. At hindi iyung magtuturu-turuan ang kung sinu-sino. 30

No comments:

Post a Comment